SAHA INSTITUTE OF NUCLEAR PHYSICS
Department of Atomic Energy, Govt. of India
SINP Home Webmail Member Search A+ A A-
Log in
bm e

The divisional activity is multifaceted and spread over, developmental electrical projects, extension of existing electrical system to suit requirements, induce flexibility in existing electrical system by introducing improvised mechanism, imposing higher protection to system depending on their vulnerability and maintenance of the total electrical system on annual and daily basis.

To distribute and Maintain the Power Distribution system of SINP. Maintenance of the A/C’s already fitted at different location on Regular Basis. Maintenance of the Lift’s installed in SINP and SINP Quarters. Operation and maintenance of DG Set in SINP.


SINP having own 33KV/.433 KV Sub-Station (2*2500KVA). SINP having Emergency Power(DG Set)960KVA .



 

Last Updated on Friday, 11 April 2014 19:01
Copyright © 2024 Saha Institute of Nuclear Physics. All Rights Reserved. Designed & Developed by UCDS